Do not let the brick work between two openings become a column by definition.
If the space between two openings remain less than 18 “ then RCC column should be provided in the space for the safety of the building.
Provide all openings in masonry with RCC lintel.
Avoid dismantling of brick work for making openings.
Cutting Chases in Brick Wall
- Avoid horizontal chases as far as possible. In case horizontal chases are not avoidable, in that case more than three chases should not be permitted in any stretch of wall.
- Provide vertical chases for laying electrical and water supply pipe.
- Do not allow the depth of vertical chases and horizontal chases to exceed 1/3 and 1/6 of the thickness of walls.
- Do not cut any vertical chases within 1.5 depths from the edge of the wall.
- Avoid chases under the bearing of the beams.
- Do not permit any chase in half brick wall.
- Do not keep vertical chases closer than two meters in any stretch of a wall.
- Fill chases with cement mortar after fixing pipes. The chases should be filled with cement concrete or cement mortar 1:4.